Skip to content
A PERI COMPANY
Festhalle Bern under construction

Challenging concreting made easy with temperature and pressure sensors

Festhalle Bern, Läderach Weibel AG

(Bern, Switzerland)

icon-customer-s
Customer

Läderach Weibel AG

icon-location-s
Location

Bern, Switzerland

icon-category-s1
Project type
Cultural Building
Bern, Switzerland

Festhalle Bern

Description

The new Festhalle Bern offers an impressive indoor total area of 9,400 m². The multifunctional hall spans 4,300 m² and also includes eight additional areas, including an event hall for up to 1,200 people.

 

Challenges

The Festhalle, with wall heights of up to 18.25 m, was constructed in two phases. The lower 13 m were poured in one stage, while the upper 5.25 m were realized using climbing formwork. Given that construction took place during the winter months, special care was required for both the concrete and the formwork.

 

Solution and results

Thanks to concrete pressure monitoring, the pouring process for the 13 m high walls was optimized. The delivery and placement of the concrete were precisely coordinated with the concrete pressure, allowing for a swift and secure construction of the high walls. To minimize the stripping time during the cold winter months, temperature monitoring was also employed during certain pouring stages. This led to a significant reduction in the stripping period in close collaboration with the engineer.

This project was realized in close cooperation with PERI Switzerland.

200220_022_TRIIIPLE_Wien_A_mz_hr
Lorem Ipsum
BobBaumeister
Allgemein:
  • 11,75 m Fassadenstützen in SB 4 Sichtbetonqualität
    aus Weißbeton
  •  
Herausforderungen: 
  • individuelle Sonderschalungslösungen
  • Unterstützung und Schulung des Baustellenpersonals bei der Umsetzung der komplexen Geometrien und Formen 
  • Termingerechte Materialbreitstellung und Koordination der Liefertermine

Curious?

We will present the solution to you in a 20-minute online demo without any obligation.